T&M , Time & Material, Project Connect, PM

We are a subcontractor and we end up with Contracts, CO's & T&M on a project.

The Ticket tracking is not as fluid as it needs to be thru out PC:

1. Project Connect does not show what tickets are on a project. ( Outstanding, Paid )  

2. Project Connect does do not affect your over all contract amount either. 

3. To change on the contract amount you basically have to enter as a COR, CO or AIA

4. If you do a COR you have to void the T&M and tracking of the info cause you cant have double billings.

5. Project Reports exclude anything to do with Tickets. 

I would like to commend the "Management Report and its new drill down feature" and state that this is the only report I know of that I can get the over all report that I'm referring to as an over view. Although I can not "drill down" into the T&M tickets. 

I know that I can look at Binder items and open receivable tab and be able to find it there. 

I also know there is a T&M Report that allows you to quickly see all T&M open/closed. ( This report is useful however has major limitations like all of the reports that are similar to this style of report - do not have overall totals at bottom ect. )

My point: I would like to see the same information that is displayed in the management report showing the T&M Amount applied to Project Connect as T&M ( with drill down added ) . maybe even a Total Potential Contract/ Billings and if the customer issues us a CO for a T&M ticket. 

We should also have the functionality to select 2+ T&M's we should be able to apply that to a n inbound CO ( Or CMR for that matter ) selecting the Tickets that apply ( maybe discount option if they change the amounts ). This should not change the fact that they "Were" T&M to start with in PC. That way when I look back over the year and want to know how much in T&M we did for a customer or the year, we can get an accurate figure. 

Part 2- Tickets are assigned to a "project" we should be able to include tickets "Paid/ Unpaid" in the reports feature as well. While some projects show losses, these reports can be inaccurate if Ticket -Invoices were paid, but because they are not official CO's they are not reflected. 

  • Vaughn Dobbins
  • Jun 13 2017
  • In Review
Company CCSI
Job Title / Role VP-Owner
I need it... 12 months
  • Attach files

Dear Viewpoint Suggestion Box contributor;

We at Viewpoint sincerely thank you for your contribution to Suggestion Box on how we can improve Viewpoint products. While we can’t do everything at once, we rely upon your feedback to help guide the prioritization of our product improvements, and Suggestion Box is a critical tool for us to understand and prioritize our customers’ needs. Viewpoint reviews Suggestion Box regularly for all of our products and updates statuses, adds comments, and performs various house-keeping (including deleting) as needed to ensure that Suggestion Box is maintained as a productive environment for product enhancements requests.

1515 SE Water Avenue, Suite 300, Portland, OR 97214 |  800.333.3197  | Contact Us | Terms of Use | Privacy | Support Policies

© 2023 Trimble Inc. All Rights Reserved. Viewpoint®, Vista™, Spectrum®, ProContractor™, Jobpac Connect™, Viewpoint Team™, Viewpoint Analytics™, Viewpoint Field View™, Viewpoint Estimating™, Viewpoint For Projects™, Viewpoint HR Management™, Viewpoint Field Management™, Viewpoint Financial Controls™, Vista Field Service™, Spectrum Service Tech™, ViewpointOne™, ProjectSight® and Trimble Construction One™ are trademarks or registered trademarks of Trimble Inc. or its affiliates in the United States and other countries. Other names and brands may be claimed as the property of others.