Update Work in Progress - Allow manual input of cost at completion at cost type level

I have figured out how to forecast at the cost type level.  I have set up my project % complete method to enter method at the cost type level. I worked around the quantity issue by creating a new cost type called Quantity, and I only enter in quantity in this cost type.  I set up the Quantity cost type Percent Complete Method as "Units - Manually Entered Units Complete.  For each other cost type, I use the Percent Complete Method Cost % - Calculated until manual entry of any %. 

You'd think that if I select a Percent Complete Method that specifically says "Calculate until MANUAL entry of any %" that the system would allow for a manual entry of % complete for that particular cost type within that cost code.  But it doesn't.  The system overrides the % complete to 100% after I hit the "Save WIP Entry" button.  What gives?

The system has two columns that I find rather strange.  One is called Projected Cost and the other is called Cost at Completion.  The system allows the Projected Cost Column to be manually updated, but it does not allow the Cost at Completion column to be manually updated.

Where the error is encountered, is that the system does the WIP calculation based on Cost at Completion column and not on the Projected Cost Column.  I need to have control over the number that I use that has an impact our financial statements.  Until then, I have to calculate WIP outside of the system, which was not my intentions when I chose PCMX as a software.  I was under the impression that a construction accounting software would be able to track Cost at completion at this level of detail, but it cant, which is very frustrating, among other things.

Also

I have always used the terms "Projected Cost" and "Cost at Completion" interchangeably.  You'd think that one would mean the other, but this system has two separate meanings for the two names and they are very different.  Not to mention there is also a term within the system called "Forecasted Cost", I still have not figured out where this term is used in the system.  I know that in my project settings, I told the system what I expect Forecasted Cost to be, but besides that, the system has not used this number in any relevance to me.

 

 

  • Curtis Van Ruskenveld
  • Mar 23 2016
  • In Review
  • Attach files
  • Kara Silva commented
    March 23, 2016 18:33

    Hi Curtis - I'd be interested in discussing this with you.  We've had similar issues.  Just sent you a connection request on linked in.

Dear Viewpoint Suggestion Box contributor;

We at Viewpoint sincerely thank you for your contribution to Suggestion Box on how we can improve Viewpoint products. While we can’t do everything at once, we rely upon your feedback to help guide the prioritization of our product improvements, and Suggestion Box is a critical tool for us to understand and prioritize our customers’ needs. Viewpoint reviews Suggestion Box regularly for all of our products and updates statuses, adds comments, and performs various house-keeping (including deleting) as needed to ensure that Suggestion Box is maintained as a productive environment for product enhancements requests.

1515 SE Water Avenue, Suite 300, Portland, OR 97214 |  800.333.3197  | Contact Us | Terms of Use | Privacy | Support Policies

© 2023 Trimble Inc. All Rights Reserved. Viewpoint®, Vista™, Spectrum®, ProContractor™, Jobpac Connect™, Viewpoint Team™, Viewpoint Analytics™, Viewpoint Field View™, Viewpoint Estimating™, Viewpoint For Projects™, Viewpoint HR Management™, Viewpoint Field Management™, Viewpoint Financial Controls™, Vista Field Service™, Spectrum Service Tech™, ViewpointOne™, ProjectSight® and Trimble Construction One™ are trademarks or registered trademarks of Trimble Inc. or its affiliates in the United States and other countries. Other names and brands may be claimed as the property of others.